AML manual for a football club

The manual is the first document a supervisor asks for, and the one that most often reveals that the system does not exist. A correct text downloaded from another sector is spotted on first reading. This page explains which chapters a club’s manual must have, which bodies it creates, who approves it and how it is kept alive season after season.

A review of your manual

We reply within 24 h

What a club’s manual is and what it is not

The manual is not a legal document that is drafted once and filed away: it is the internal rulebook that says how decisions are made at the club when an alert comes up. If the team that negotiates does not recognize it as a description of its own work, the manual is not doing its job, however well drafted it is.

Definition · AML manual

The manual is the internal document that sets out the policies, procedures and bodies through which the club meets its anti-money laundering obligations.

It is approved by the management body, applied in day-to-day operations and reviewed periodically. It is also the first piece of evidence produced in an inspection.

Definition · What it depends on

The manual is not written in a vacuum: it is calibrated on the club’s risk self-assessment. That analysis determines which controls are needed and how intensive they must be.

Drafting the manual before you have the risk analysis means writing blind, and that is the order in which it is done most of the time.

Architecture of a club’s AML manual The risk self-assessment underpins the manual, which in turn supports the operating procedures and the evidence. WHAT EACH PIECE DEPENDS ON Risk self-assessment What risks this club faces and how intense they are AML manual Rules, bodies and decision criteria AcceptanceSignings AlertsTraining CounterpartiesPer-transaction due diligence Analysis and reportingPlan and evidence Files and evidence The only thing that exists when someone asks three years later If the self-assessment has not been done, the manual has nothing to calibrate against and the procedures are written blind
Figure 1. System architecture. The four pieces at the bottom are the procedures people use every day; the manual gives them their rules; and the risk self-assessment determines how demanding each one should be. When the top piece is missing, the ones below are written by default and end up either disproportionate or insufficient.

Which chapters a club’s manual must have

This is the structure we propose for a professional football club. It is not a bank’s structure adapted: it is built on the transactions a club actually carries out—signings, commissions, sponsorships, shareholdings and ticketing—and on who decides them within the organization.

Table 1 · Contents chapter by chapter
ChapterWhat it must cover
1 · Scope and responsibilitiesWho within the club is bound by the manual, which areas are affected and who is accountable for applying it.
2 · Risk analysisSummary of the self-assessment: risks identified by transaction, counterparty, channel and jurisdiction, and how controls are calibrated on it.
3 · Acceptance policyWhich counterparties are accepted, which require enhanced approval and which are not accepted, and who can authorize an exception.
4 · Due diligenceWhat is checked for each counterparty, with what documentation and at what point, with the three levels of intensity and the cases that trigger each one.
5 · Beneficial ownershipHow the ownership chain is traced, which sources are used and what happens when it cannot be completed.
6 · Signings and transfersA specific procedure for the highest-risk transaction, including agents, commissions and deferred payments.
7 · Sponsorships and shareholdersChecks required before signing a sponsorship agreement or letting a new investor into the share capital.
8 · Cash and ticketingLimits, identification above a threshold and traceability of payment methods in ticket and season-ticket sales.
9 · Detection and reportingHow an alert is generated, who analyzes it, how quickly, who decides and how the outcome is documented, including the duty to refrain from executing transactions.
10 · Record keepingWhat is filed, in what format, for how long, who can access it and how it is retrieved.
11 · Control bodiesComposition and functions of the internal control body, appointment of the representative and reporting lines to the board.
12 · TrainingAnnual plan, target audience by role, content, assessment and record of the training delivered.
13 · Review and auditHow often the manual is reviewed, triggers for an early review and the arrangements for the external review.

Structure proposed on the basis of the obligations in Regulation (EU) 2024/1624 as applied to a club’s operations. The minimum required content must be checked against the articles of the Regulation and the Spanish implementing law.

Six workstreams to make the manual work

Drafting the document is the quick part. What makes it work is the groundwork of understanding how the club makes decisions and the follow-up work of getting the team to use it.

Which bodies the manual creates and what each one does

A mid-sized club does not need a heavy structure, but it does need a clear one. What a supervisor checks is not how many people there are, but that each function is assigned, known and working.

Table 2 · Bodies and functions at a club
Body or functionIts responsibilitiesWhat is checked
Management bodyApprove the manual and the risk self-assessment, and be accountable for the effectiveness of the system.Dated approval minutes, and a record showing that it receives regular information on how the system is working.
Internal control bodyAnalyze alerts, decide on reports and propose improvements to the system.A defined composition, meetings with minutes and documented decisions, not just its formal existence.
Representative before the authorityAct as the formal point of contact and be responsible for reporting suspicious transactions.Formal appointment, notification to the supervisor and real availability.
Sporting managementApply the procedure in transfer dealings and escalate any alerts it detects.Documented training and a record showing that alerts are escalated and not resolved informally.
Legal team and administrationCarry out the checks, keep the files and verify payments.Complete, retrievable files that include the analysis, not just the contracts.
External reviewIndependently check that the system works as the manual says.A report with a defined scope and documented follow-up of its recommendations.

Indicative allocation. Combining functions is possible at small clubs, but it must be justified in writing and respect any incompatibilities arising from the law.

The manual is a cycle, not a deliverable

The most common finding in any inspection, in any sector, is the same: a manual approved years ago that nobody has touched since, while the organization has changed completely. At a club, where the management team and the ownership change frequently, that gap opens up even faster.

Life cycle of the AML manual Five phases repeated every season: draft, approve, apply, review and audit. DraftApproveApplyReview Audit Built on the analysisManagement body After prior trainingEvery season External and periodic THE AUDIT RESULTS FEED BACK INTO THE MANUAL A manual approved and never reviewed is the most common finding in any inspection
Figure 2. The five phases and the feedback loop. What closes the cycle is the external review: checking that what the manual says and what the club does are still the same. That comparison is the only way to detect the gap before the supervisor does.

What a poor manual reveals

A deficient manual is not an isolated documentation problem: it is the warning sign that leads the supervisor to look at everything else more closely.

Template manual: a text that talks about customers, branches or financial products at a football club is spotted on the first page. From then on, the whole file is read on the presumption that the system exists on paper and not in reality.

Contradiction with day-to-day practice: the manual says that transactions above a certain amount require approval from the control body, and the files show that it was never requested. That contradiction is more serious than not having the procedure in writing.

Approval without a date or minutes: a manual with no record of who approved it and when does not prove that the management body has taken responsibility for the system, which is precisely what the law requires.

TrainingNo evidence

An excellent manual that nobody has read protects no one. Without a training record by role, the presumption is that the document has not been rolled out.

ReviewFrozen document

A manual approved and never reviewed despite changes in ownership, management or operations is the most common finding and the hardest to justify.

BodiesOn paper only

A control body set up on paper but with no meetings or minutes is, for inspection purposes, the same as a body that does not exist.

Does your manual describe the club you are, or the club it claims to be?

We prepare the risk self-assessment, draft the manual based on how your club really makes decisions and leave the procedures, templates and training ready to use.

REGULATORY CONTROL CENTER · MANUAL AND INTERNAL SYSTEM

Control panel: what structure each club needs

Proportionality allows a small club to have a light system, but not to be missing any piece. This panel shows what depth is appropriate for each size.

Required depth by club size

Indicative benchmark for prioritizing the work and sizing the project team.

Area
Large club
Mid-sized club
Small or newly promoted club
Control body
LowStructure already exists
MediumSet up and resource
HighCreate from scratch
Operating procedures
MediumFormalize what exists
HighWrite from scratch
MediumFewer transactions
Training by role
HighLarge workforce
MediumSmall team
MediumFew people
External review
MediumInternal audit
MediumCan be outsourced
HighNo in-house resources

Six mistakes in a club’s manual

They all produce the same result: an impeccable document and an organization that does not apply it.

Mistake 01

Writing the manual before the risk analysis

It is the most common sequencing mistake. Without a self-assessment there is no basis for deciding which controls are needed or how intensive they should be, and the manual ends up disproportionate in some areas and insufficient in others.

Mistake 02

Adapting another sector’s manual

A club does not have customers: it has counterparties. It does not have branches: it has a sporting management team that negotiates. A manual that does not use the club’s vocabulary or processes will not be used by anyone at the club.

Mistake 03

Drafting it without talking to the decision-makers

The manual has to describe how transactions are actually approved. That is not in any organization chart: you find it out by asking sporting management, administration and the board.

Mistake 04

Not defining who can stop a transaction

A procedure without a person with authority to stop a signing is just a formality. You have to state who that person is, what information they base the decision on and how quickly they must respond.

Mistake 05

Approving it without keeping a record

A manual with no approval minutes, no date and no record showing that the board receives regular information does not prove that the management body has taken responsibility for the system.

Mistake 06

Never touching it again

Ownership changes, sporting management changes, operations change, and the manual still describes the club as it was three seasons ago. It is the most common finding of all.

How to write a manual that gets used

Three principles that separate a working manual from a document for the archive.

Recognizable

The team has to see itself in it

If sporting management reads the manual and does not recognize the way they work, the manual describes a different organization. That is the most useful test: give it to the people who negotiate and see whether it sounds familiar.

Decision-led

Every procedure ends in a decision

Listing checks is not enough: you have to say what happens with the result. Who assesses, who authorizes, who can stop the transaction and how quickly they must do so.

Living

With a review date and an owner

A manual needs someone responsible for maintaining it and a review schedule, plus a list of events that require an earlier update: a change of ownership, management, operations or legislation.

Checklist: 12 points for the club’s manual

  1. Check that a prior risk self-assessment exists and that the manual is calibrated on it.
  2. Verify that the manual uses the club’s vocabulary: counterparties, signings, commissions, sponsorships.
  3. Interview sporting management and administration before drafting, to find out how decisions are really made.
  4. Define the counterparty acceptance policy and who can authorize an exception.
  5. Set the three levels of due diligence and the specific cases that trigger each one.
  6. Include a dedicated chapter on signings and transfers, with its file templates.
  7. Expressly regulate sponsorships, new investors entering the share capital and shareholder loans.
  8. Set up the alert workflow: who raises an alert, who analyzes it, who decides and how quickly.
  9. Set up the internal control body and formally appoint the representative before the authority.
  10. Have the management body approve the manual and keep dated minutes.
  11. Roll out training by role and keep evidence of who received it.
  12. Set how often the manual is reviewed and the events that require an early update.

If you would like us to review or draft your club’s manual, see our AML services or request a free consultation.

Working glossary

The manual’s vocabulary

Parts of the system that should not be confused with one another, because each one responds to a different obligation.

ManualDocument

The system’s internal rulebook

A document approved by the management body that sets out the club’s anti-money laundering policies, procedures and bodies.

It is the first thing an inspection asks for.
Self-assessmentFoundation

The club’s risk analysis

A prior document that identifies and assesses the risks specific to the activity, and on which the intensity of all controls is calibrated.

It comes before the manual, not after.
Acceptance policyRule

Who you deal with and who you do not

Criteria that determine which counterparties are accepted, which require enhanced approval and which are rejected.

It must state who authorizes exceptions.
OCICBody

Internal control body

The body that analyzes alerts, decides on reports and proposes improvements to the system. With meetings and minutes.

Its formal existence is not enough.
RepresentativeRole

Point of contact with the authority

The person formally appointed as responsible for reporting suspicious transactions and for the relationship with the supervisor.

Formal appointment, duly notified.
AlertProcess

A signal that triggers analysis

A circumstance detected in a transaction that requires it to be analyzed before going ahead. It does not imply suspicion: it implies checking.

It must be recorded even if it is dismissed.
Duty to refrainDecision

Not executing when there is suspicion

The obligation not to carry out the transaction where there is suspicion, except in specific cases set out in the law. The manual must say who decides.

It has to be planned before it is needed.
EvidenceProof

A retrievable record

Documentation proving that the procedure was applied: files, minutes, training records and signed decisions.

If it is not on file, it did not happen.
ReviewCycle

Periodic update

Checking that the manual still describes the real organization, at a defined frequency and with triggers for an earlier review.

A frozen manual is a guaranteed finding.

A club’s AML manual: frequently asked questions

What is a club’s AML manual?

It is the internal rulebook that sets out the policies, procedures and bodies through which the club meets its anti-money laundering obligations. It is approved by the management body, applied in day-to-day operations and reviewed periodically.

It is also the first document requested in an inspection, and the one that most often reveals that the system exists on paper and not in reality.

Which chapters should it have?

We propose thirteen: scope and responsibilities, risk analysis, acceptance policy, due diligence, beneficial ownership, signings and transfers, sponsorships and shareholders, cash and ticketing, detection and reporting, record keeping, control bodies, training, and review.

What matters is not the numbering but that no obligation is left without an assigned procedure and that every procedure ends in a decision.

Can I start from another sector’s manual?

As a structural reference, yes. As a document to adapt with find-and-replace, no. A club has no customers or branches: it has counterparties, a sporting management team that negotiates and operations concentrated in two transfer windows a year.

A manual that does not use the club’s vocabulary or processes will not be used by anyone at the club, and that is exactly what is spotted on first reading.

Which comes first, the manual or the risk analysis?

The analysis, always. The risk self-assessment determines which controls are needed and how intensive they must be; the manual develops them. Doing it the other way round produces a document that is disproportionate in some areas and insufficient in others.

It is the most common sequencing mistake we find when reviewing systems.

Who has to approve it?

The club’s management body. And there must be a record of it: dated minutes, and evidence that the board receives regular information on how the system is working.

Without that record, there is no proof that the management body has taken responsibility for the system, which is the responsibility the law assigns to it.

What control structure does a small club need?

The principle is proportionality: the structure can be very light, but no function can be missing. There must be an internal control body (even a small one), a representative appointed before the authority and someone with the authority to stop a transaction.

Functions can be combined, but this must be justified in writing and must respect the incompatibilities.

How often does it have to be reviewed?

At least once a season, and also whenever something happens that makes it outdated: a change of ownership, a change in sporting management, a significant change in operations or a change in the law.

A manual approved and never reviewed is the most common finding in any inspection, in any sector.

Is an external audit needed?

An independent comparison between what the manual says and what the club does is the only reliable way to detect the gap before the supervisor does. For clubs without internal audit resources, an external review is also the most efficient route.

The scope must be defined and the follow-up of the recommendations documented.

Who needs to be trained?

Whoever can spot an alert, and that is not the legal department: it is the sporting management team that negotiates the signing, whoever signs the sponsorship and whoever deals with intermediaries.

Training must be tailored to each role and leave retrievable evidence of who received it, when and with what content.

By when does it have to be ready?

Professional football clubs are obliged entities from July 10, 2029. By that date the system has to be set up and running, not under construction.

Bear this in mind: a manual written in 2029 goes into its first inspection with no track record of application to show. We explain the scope and the timeline on our page on AML for football clubs.

Official sources

Everything stated on this page comes from the EU legislative package or from official Spanish documents still in the legislative process.

How this page is prepared and updated

Regulatory content ages quickly, and an outdated guide wastes the time of anyone who follows it. That is why we publish who maintains it and how.

Who prepares it

Molina Law Boutique, a law firm specializing in financial regulation and anti-money laundering. We draft AML manuals and systems built on how each organization really works, not on templates.

If you would like us to review your club’s manual, you can write to us directly.

Our method

We start from the text of Regulation (EU) 2024/1624 published in the Official Journal of the European Union and reproduced in the BOE, and from the official documents of the ongoing Spanish legislative procedure.

The chapter structure and the allocation of functions are our own proposal based on the obligations in the law; the minimum required content will depend on the Spanish implementing law.

Update history

  • Initial publication. Content checked against the BOE entry for Regulation (EU) 2024/1624, the Ministry of Economy’s public consultation page and the official summary of the Council of Ministers meeting of July 28, 2026.
  • Planned for when the public consultation closes and once the minimum content of the manual set by the Spanish implementing law is known.

Book a call

Tell us whether you already have a manual, when it was approved and who applies it, and we will tell you what needs to be redone and what can be kept.

A football club’s AML manual: what it contains and why it fails

When a supervisor walks into any obliged entity, the first thing it asks for is the manual. Not because the document is the most important part of the system, but because it is the one that most quickly reveals whether the system exists. A text that talks about customers, branches and financial products inside a football club is identified on the first page, and from then on everything else is read on the presumption that compliance is a mere formality.

Order matters more than content

The most widespread mistake is not in what the manual says, but in when it is written. The manual is calibrated on the risk self-assessment: it is that analysis that determines which controls are needed and how intensive they must be. Drafting the document first and doing the analysis afterwards—which is the real order in most projects—produces a manual that is disproportionate in areas that do not need it and insufficient precisely where the club’s risk is concentrated.

A club is not a small bank

The temptation to start from a bank’s manual is understandable, and it ends badly. A club does not have customers: it has counterparties, and very few of them. It does not have a branch network: it has a sporting management team that negotiates. It does not operate continuously: it concentrates most of its high-risk transactions in two transfer windows a year, under calendar pressure that no bank manual contemplates. The vocabulary and the processes have to be the club’s own, or nobody at the club will use them.

Procedures end in decisions

A useful manual does not just list checks: it says what happens with the result. Who assesses the alert, who authorizes going ahead, who has the authority to stop a signing and how quickly they must respond. That part—the least eye-catching and the most often omitted—is what turns a procedure into a control mechanism. Without a person who can say no, the manual describes a formality.

What gets checked three years later

When the inspection comes, the manual will only be the starting point. What will be checked is whether what it says matches what the files show: whether the transactions that, according to the manual, required the control body’s approval actually got it; whether the training the manual provides for was delivered and recorded; whether the body the manual creates met and took minutes. A contradiction between the document and the evidence is more serious than the absence of the document, because it proves that the system was written down and not applied.

Football club AML manual AML manual Risk self-assessment Internal control body Representative before the authority Acceptance policy Due diligence Mandatory training Record keeping External review Regulation (EU) 2024/1624 Obliged entities